DIY energy audit tool, built for the people who run the building
01
Benchmark
Upload your billing data and see how you compare to other hotels in your category and region.
Your headline
11,800
kWh per room a year
Monthly energy
Where the energy goes
- Heating 43%
- Catering 20%
- Hot water 17%
- Lighting 12%
- Other 7%
- Cooling 1%
Energy, carbon and cost by fuel
Energy
- Electricity 25%
- Gas / oil 75%
Carbon
- Electricity 12%
- Gas / oil 88%
Cost
- Electricity 43%
- Gas / oil 57%
02
Guided energy audit
A walkthrough energy audit your team can work through at their own pace. Find the saving opportunities yourself.
O&M manual upload
PDF
Site Mode
Automatically upload data from photos on site.
Boiler 1 · 250 kW · 2014
ConfirmAsset management
Asset scheduleReplacement window
Automatic schematicBuilt from your schedule
Audit checklist
Heating
Does the boiler incorporate weather compensation appropriately?
YesNoNot sure
Do circulation pumps/fans have variable speed drives (VSD)?
YesNoNot sure
Leaks, unusual noise, or vibration?
YesNoNot sure
Your hotel's assistant
Ask about your hotel…
03
Tailored actions
Actions ranked by payback and by carbon, kept separate, with a clear flag and a bespoke follow-on scope list when an engineer is needed on site.
Recommendations
Very high payback potential · typically under 1 year
Match heating times to occupancy
High payback potential · typically 1–2 years
Fit weather compensation to the heating circuit
Medium payback potential · typically 2–5 years
Add variable speed drives to the heating pumps
Low payback potential · typically over 5 years
Plan the boiler replacement
Follow-on survey scope
Follow-on survey scope
For an engineer to price and visit
- 1Boiler 1: condition and combustion check
- 2Heating pumps: confirm speed control
- 3Switchboard: capacity for a heat pump
The items that need an engineer on site, highest impact first.
Energy Audit Summary Report
Energy Audit Summary Report
A Remarkable Hotel, Queenstown
A report for your general manager, ready to print or share.
Asset replacement
Boiler 2
Gas · non-condensing · 1998
Replace withan air-to-water heat pump
Carbon90–105 t CO₂e lessa year
Running cost$8k–16k lessa year, at your confirmed rates
!Professional follow-on survey required to verify feasibility.
Designed in Queenstown, New Zealand, by a chartered building services engineer, grounded in recognised engineering guidance.